6 Benefits of Cost-Loading in Your Construction CPM Schedule vs a Regular Baseline Schedule

Share this Post

Owner Benefits of Cost-Loading a Construction Schedule

These days, owners are increasingly asking contractors to present a cost-loaded baseline schedule with cost-loaded revisions, depending on the project scope.

This request is outlined in several Schedule Specifications that I’ve seen, mostly for medium- to large-sized jobs.

Why?

1. Owners Are Intending to examine How their funds are being Used

Understandably, owners are curious about the project’s continuing finances rather than just the dates. Stakeholders, including owners, require regular updates on the status, risks, and return on their investments.

The path to total completion of a construction project can include several deviations, and owners have more ability to decide on important details when a cost-loaded timeline is at their disposal. A cost loaded baseline schedule show more control on project costs as there is a cost attributed to EACH activity allowing you to calculate total cost.

2. Owners Want to Forecast Cashflow

Like contractors, owners can forecast demand for funds and expenses using a time-phased, cost-loaded schedule. They can take a more practical and cost-aware approach thanks to this knowledge.

3. Claims Avoidance

As claims are expensive for both parties, owners try to reduce the number of construction delay claims. The schedule will undoubtedly be used as a tool to settle any clashes.
Sometimes the openness necessary for a contractor to deliver a cost-loaded timetable is a step in the direction of the owner and contractor working together more closely.

HSE General Contractor’s Benefits and Usage of Cost-Loading Schedules vs. Regular Baseline Schedule projects

Cost-loading construction project schedules is something that HSE contractors are hesitant to do. It requires a great deal of labor (to be discussed), and the benefits aren’t always obvious.

The idea is that project schedules should simply scale to a large project without requiring adjustments to project control processes because they have probably completed many smaller projects without a cost-loaded timetable. This is not exactly true as stated above. The more you know what your costs are exactly, the more you will know what needs to be handled from the very beginning of construction.

By putting costs on all activities you will be able to;

  • Allocate your resources properly so you don’t run out of money or delay any other tied logic activities.
  • Make accurate cash flow projections
  • Recoup costs quicker and more accurately (Invoicing for completed activities)
  • Earned value management
  • Overall more project control for schedule relating to costs and timelines

The following are advantages of cost-loading schedules vs. regular baseline schedules for general contractors, subcontractors and consultants to think about

1. Track Earned Value

With cost-loading comes Earned Value Management. HSE Contractors take advantage of Earned Value’s superior performance tracking over just comparing current dates to plan.

Earned Value Management lets HSE see what they’ve earned based on their performance to better evaluate both schedule and cost overruns.

Earned value helps in managing the planned earned values versus the actual values which helps the client to estimate exactly how much the actual cost spent up to the date of the last schedule update and also the next phase required actual cost and at remaining cost to finish the project this also help in the project profit calculations as it helps to make the direct cost for the project very clear to the client and this helps to have an overall cost control for the project and track earned value and identifying problem areas where earned value is missing.

2. An Improved Expenses Schedule

A costed project schedule lets HSE Contractors visualize cost spending based on timelines. That is why we call it a time-phased budget.

Assigning costs to activities allows those costs to essentially move with activity dates. And thus, better planning from the cost and time perspective for the contractor. This gives him a monthly view of internal and external costing for the project.

3. Projected Cash Flow and Owner Income

Recall that the projected costs specified by the general contractor in the bid would be included in a cost-loaded schedule. These represent a profit rise added to the general contractors’ actual expenses.

As a result, depending on their performance, HSE Contractors may now accurately predict their revenue distributions from the Owner. This is a significant advantage that will aid our contractors in managing their commitments and cash flow.

Conclusion

Do more owners now tend to include cost-loaded timetables in their project contracts? Yes. It is expected that the tendency toward creating and overseeing cost-loaded construction schedules will continue to rise as projects grow in size and complexity, particularly with multiple stakeholder agreements like large public-private partnerships.

Cost-loading schedules help you show the project owner direct control over all costing from each individual activity having a number value which greatly assists in figuring out which invoices you can recoup, track earned value, and accurately make cash flow projections. This allows you to allocate resources in an organized way from the very start of the construction timeline to minimize overspending and avoiding delays.

Want to learn more about how to Cost-Load schedules in Primavera P6?
Click here! https://www.hsecontractors.com/services/cpm-scheduling/

Getting Started with HSE Contractors:

To learn more about our BIM consulting services and how we can help you with your construction project, contact us for a project assessment or consultation. Our team is ready to provide you with customized solutions to fit your unique needs and exceed your expectations. Contact us today to get started!

FAQs

Cost-loading in a construction CPM (Critical Path Method) schedule refers to the process of assigning costs to specific activities or tasks within the project schedule. This allows for a more detailed and accurate analysis of project costs and timelines.

The benefits of cost-loading in a construction CPM schedule include improved cost estimation, enhanced cash flow management, and better resource allocation. Additionally, cost-loading allows for more accurate forecasting, improved risk management, and increased transparency and accountability.

Cost-loading improves cost estimation by allowing project managers to assign specific costs to individual activities or tasks. This enables a more detailed and accurate breakdown of project costs, reducing the risk of cost overruns and improving budgeting.

Cost-loading has a significant impact on cash flow management by providing a clear and accurate picture of project expenditures over time. This enables project managers to better plan and manage cash flow, reducing the risk of cash flow crises and improving overall project financial management.

Cost-loading enhances resource allocation by providing a clear understanding of the resources required for each activity or task. This enables project managers to allocate resources more effectively, reducing waste and improving project efficiency.

Common challenges of implementing cost-loading in a construction CPM schedule include data accuracy and integrity, integration with existing systems, and training and adoption by project team members. However, the benefits of cost-loading far outweigh the challenges, and with proper planning and implementation, these challenges can be overcome.